Journal of Membrane Science and Research

Journal of Membrane Science and Research

Performance Evaluation of MXene/PPy-Modified Nylon Membranes for Oil/Water Separation

Document Type : Research Paper

Authors
1 Department of Chemical Engineering Technology, Faculty of Engineering Technology, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Panchor, Johor, Malaysia
2 Department of Physics and Chemistry, Faculty of Applied Sciences and Technology (FAST), Universiti Tun Hussein Onn Malaysia (UTHM), Pagoh Campus, 84600, Pagoh, Johor, Malaysia
Abstract
This study examines the performance of MXene (Ti3C2Tx)/ polypyrrole (PPy)-modified nylon membranes for oil/water separation. The initial step involved optimizing the formation of PPy on the nylon membrane by systematically controlling three factors: the concentration of pyrrole (Pyy) (0.10-1.00 (v/v%)), concentration of ammonium persulphate (APS)(0-200 mg/L), and volume of pyrrole solution (Pyy)(10-20 mL). The optimization was performed using response surface methodology (RSM) via Box-Behnken design (BBD) method. The correlation between measured and predicted water rejection values, with R² exceeding 90%, demonstrated the model's reliability. Upon establishing the optimal formulation of PPy-modified nylon membrane, MXene was incorporated into the optimized PPy formulation to obtain MXene/PPy-modified nylon membrane. MXene was successfully synthesized, with its formation confirmed by XRD, FTIR, SEM and AFM. The membrane performance was evaluated using a vacuum filtration device, with the rejection performance recorded at 91.7% for the MXene/PPY-modified nylon membrane, 85.97% for PPy-modified nylon membrane and 86.6% for pristine nylon membrane. Experimental results indicate that the MXene/PPy-modified nylon membrane demonstrated an improvement on membrane separation efficiency, highlighting the potential of the current approach.

Graphical Abstract

Performance Evaluation of MXene/PPy-Modified Nylon Membranes for Oil/Water Separation
Keywords
Subjects

  • Receive Date 18 March 2025
  • Revise Date 22 July 2025
  • Accept Date 29 July 2025